Electric power supply

The procedure for the transition of the consumer from ORT to the company "GasEnergyTrade"

The consumer who made the decision to switch to PNT for the purchase of electricity at a free tariff must perform the following procedural steps:

  1. Sign a sales contract with the energy company GazEnerdzhiTreyd..
  2. To issue the “Certificate of Consumer Accounting Status” in accordance with the template of the Wholesale Electricity Market, to which applications should be:
        Certificate for a local data collection and processing device (LUSOD) and (or) an automated system for commercial metering of electricity (AMR)
        Protocol of Metrological certification of measuring complexes and LUSOD / ASKUE.
        Passport-protocols for checking measuring hourly complexes (counters, current transformers and voltage).The approved power supply scheme of the consumer, with an indication of the boundaries of the balance accessories and installation sites of meters.
  3. Twenty days before the beginning of the month of supply from PNT, send to PTT (power company) a letter on the need to suspend the contract between the PRT and the consumer regarding the supply of active electricity, and carry out a full settlement with the PRT for the last (current) month of delivery from the PRT.

Evaluation of the economic feasibility of buying electricity at a free rate
To assess the feasibility of buying electricity at a free rate and obtaining preliminary data on the economic effect of switching to the purchase of electricity from the energy company GazEnerdzhiTrade, you need to send us a completed questionnaire. Additionally, for more accurate technical and economic calculations, it is desirable to attach actual data on hourly electricity consumption for any particular calendar month to the questionnaire, according to the template presented:

Requirements for consumers when buying electricity at a free rate
Electricity consumers who are considering working with PNT should meet the following main criteria:

    The absence of consumer debt to the PRT (power company)
    Uniform electrical load during the day, week, month.
    The consumer has differentiated meters and an automated system for commercial metering of electricity (AMR).

The requirements of criteria 2 and 3 are priority, and may in some cases provide for consumer exemptions.

Actual prices

Rights and obligations of the parties to the contract

Rights and obligations of the electricity supplier

Rights and obligations of the electricity consumer